Blog

Notes on production management, quality and traceability.

Who is paying for the cutting tools?

Tooling is the cost item most often lost: bought, handed out, misplaced, and never written against any part.

What OEE tells you, and what it does not

A single percentage does not run a factory. OEE only becomes useful when it is split into its three components.

Why does the delivery date always slip in the last week?

The delay does not happen in the last week; it becomes visible in the last week. The difference lies in where the plan is kept.

The no-go gauge is out for calibration: what happens on the floor?

The quietest gap in calibration tracking. With the set incomplete, the check still looks passed in the record — but half of it wa…

If the downtime reason is not recorded, what is the report for?

"The machine stopped for three hours" changes no decision. What changes decisions is the reason, picked from a list at the moment…

Have you ever calculated your machine hourly rate?

If this number is unknown, part cost comes out short and the price always rests on a guess. The calculation takes half an hour.

The records that cause the most trouble in an AS9100 audit

Audits rarely fail because a procedure is missing. They stall because the record proving the procedure was followed cannot be pro…

Let your own data, not an estimate, set the quoted price

If actual work order cost never feeds back into quoting, every quotation is derived from the estimate behind the previous one.

Should the routing belong to the part or to the work order?

In job shops the same part is rarely produced on the same machine twice. Where the routing lives decides how flexible your planni…